Installer bulletin: CSIP-AUS registration for Powerwall 3 in WA

As at 14 August 2026, WA guidance did not support AC-coupled Powerwall 3 configurations. This dated bulletin records the supported pathways, registration prerequisites and site-specific export limits.

A home battery mounted on the exterior wall of a suburban house

Guidance current at 14 August 2026 states that AC-coupled Powerwall 3 configurations are not supported in any capacity. An existing solar inverter cannot be retained and the battery AC coupled alongside it, and that now applies regardless of whether the existing inverter holds CEC approval.

Two pathways remain. New solar can be wired directly into the Powerwall 3 integrated inverter, or suitable existing PV can be migrated onto that inverter with the original unit removed. Both remain subject to current network and installation requirements.

Network requirements

The technical requirements for new and upgraded rooftop solar and battery systems in the South-West Interconnected System changed from 1 May 2026, under Western Power's WEM Procedure for Standard Small User Facilities. Energy Policy WA's installer guidance, last updated 4 August 2026, treats an AC-coupled battery added to an existing inverter as an upgrade, which brings the whole installation within the new requirements rather than leaving it under the arrangement the original system was connected under.

The May 2026 requirements guide explains the wider network changes.

Existing inverter assessment

For a customer who already has solar, the question at assessment is whether the existing PV can be migrated onto the Powerwall 3 integrated inverter. Designing around retaining the existing inverter is not a supported arrangement under current guidance.

Assess migration suitability before quoting.

Registration prerequisites

The recorded registration process requires access to the Installer Testing Tool and the site NMI. Confirm both before commissioning.

Export power is required during the process, because Synergy validates the connection against actual export. A registration attempted on a site that cannot export at the time will not complete.

The registration path runs through the Powerwall interface: Advanced Settings, then CSIP Australia, then the NMI, then Start, which begins the testing runs.

Network export limits

The Powerwall 3 export limit must be configured to the requirement set by the distribution network service provider for that site. In practice that is either 5000W or no export.

Confirm the site-specific export condition against its connection approval.

Common registration failures

The August guidance records these checks:

Reported issueChecks in the dated guidance
CSIP-AUS option absentGrid code, current firmware and Powerwall 3 commissioning state
Authentication failureRemote access and customer-enabled service mode

These are recorded troubleshooting points, not a substitute for current Tesla commissioning instructions.

Three-phase configurations

The Australian Powerwall 3 is a single-phase unit and is not a native three-phase battery inverter. A multi-phase site requires Tesla-approved system architecture and phase allocation, and the supported configurations for three-phase properties in Western Australia remained under review as at 14 August 2026.

Any installation that requires an engineering assessment is not currently supported and will not receive network approval.

Tesla has advised channel partners that a dedicated three-phase Powerwall 3 is planned for future release, which bears on how a three-phase property should be assessed now.

Current documentation

The related technical conditions for mixed Powerwall 2 and Powerwall 3 systems, including the supported quantities and the unsupported metering arrangements, are set out in Powerwall 3 compatibility with existing Powerwall 2 systems and in the firmware bulletin.

This bulletin is a dated record and is not a commissioning procedure. Current Tesla documentation, the connection approval for the specific property, and the network operator's current requirements apply to the individual job. Where they conflict with anything recorded here, they govern.