Skip to content

Prioritising Safety, Precision, and Preparedness

At McKercher Corporation, our commitment to operational excellence is rooted in a shared culture of safety, precision, and preparedness, both in the field and in the office. This month’s bulletin revisits three critical updates published on the company website during November. These updates underscore our collective responsibility to work safely, stay informed about product changes, and respond effectively in the event of an emergency.

Contents

Key points

Note: These bulletins are primarily intended for McKercher Corporation staff. Non-staff members may familiarise themselves with this open-source compilation of accessible business communication.

Updated Hammer Drill Operation Procedures

Working safely with power tools starts with proper preparation. The recently updated Hammer Drill Operation Procedures outline mandatory personal protective equipment (PPE) and revised safe work practices to ensure that every operator is protected from preventable injuries. These updates include reinforced requirements for eye, ear, and hand protection, along with clear instructions for pre-start inspections, secure footing, and appropriate material handling.

All staff, especially those in field operations, must familiarise themselves with the new procedures before using powered drilling equipment again. Supervisors are responsible for ensuring compliance during site briefings and toolbox meetings. These updates were posted on the company website earlier this month as part of our ongoing commitment to meet the Work Health and Safety Regulation 2022 requirements for risk elimination and control.

Remember: safe drilling begins well before the trigger is pulled. Taking the extra moment to check your PPE, inspect the tool, and confirm worksite stability helps protect you, your teammates, and our company’s safety record.

Product Update: Sigenergy SigenStor EC AC Output Interface

Sigenergy has issued a product change notice for the SigenStor EC AC Output Interface, applicable to both current and future installations. This update modifies the specifications for components related to the AC output interface, aiming to enhance system reliability and ensure compliance with Australian standards.

For technicians and project planners, it is important to verify product compatibility and updated connection requirements before proceeding with installations. All sales and design staff should refer to the revised datasheet and installation guidance available on the McKercher Corporation website and the PSW Energy resource portal.

Since the release of the product change notice, the Sigenergy Sigen Energy Controllers (8, 10, and 12 kW), installed by PSW, are now under a voluntary product recall. This recall, initiated by the manufacturer and monitored by the ACCC Product Safety department, focuses on enhancing safety and performance. This update underscores our commitment to staying informed about our partners’ product developments and maintaining our industry reputation for accuracy, compliance, and customer trust.

Revised Emergency Protocol: Falls Rescue Plan

Our ability to respond effectively to emergencies can save lives. The updated Falls Emergency Rescue Plan (PSW-PLN-HSEQ-0X) enhances our existing Emergency Management Plan (PSW-PLN-HSEQ-01) by providing clearer response procedures and role allocations for fall incidents. This new plan includes a detailed sequence of immediate rescue actions, coordination for medical response, and established communication pathways between field teams and emergency services.

A significant addition to the plan is the formal scheduling of annual fall-rescue drills, ensuring that each field team remains proficient in rescue procedures. Supervisors are now responsible for confirming that fall-arrest systems are being used, inspected, and properly documented according to schedule. Updated documentation and emergency contact listings have been integrated into the HSEQ system and should be reviewed by all staff involved in elevated work.

This update not only addresses audit recommendations but also demonstrates our ongoing commitment to ensuring the safety of everyone working at heights on McKercher Corporation projects. Update: Falls Emergency Rescue Plan (PSW-PLN-HSEQ-0X)

Closing Message

As we wrap up November, let’s remain committed to the standards that ensure our teams stay safe and our operations run smoothly. Whether it’s ensuring compliance with personal protective equipment (PPE), integrating product updates, or practicing rescue readiness, each of us plays a crucial role in fostering a culture of care and professionalism.

If you have any questions regarding these updates, please reach out to your department lead or the HSEQ team.

McKercher Corporation — Powering Progress, Sustaining Tomorrow.